THE CHALLENGE
Maintain site-access housekeeping across a high-activity data-center development.
HOW FODS WAS USED
FODS was documented as part of the construction entrance and trackout-control approach.
REPORTED RESULT
Manufacturer case study available; project-specific result claims require final editorial review.