Operated by Kynergy International Inc.Authorized Distributor for Japan and Selected Asian Markets

COMPARE METHODS

Choose the control system the project actually needs

Compare preparation, utilities, relocation, cleaning and end-of-project removal—without assuming one method wins in every situation.

ConsiderationFODSAggregate / rock entranceWheel washFODS + wheel wash
Installation preparationLevel area and anchoringSubgrade, geotextile and aggregateCivil works, equipment and treatmentBoth dry and wet stages
Water requirementNot normally for operationNot normallyYesYes for wheel-wash stage
Electricity requirementNot normallyNoOftenOften for wheel-wash stage
Drainage requirementSite drainage still requiredSite drainage still requiredWash-water management requiredCombined drainage review
RelocationDesigned to relocateReconstruct at new positionUsually fixedFODS stage can relocate
ReuseReusable matsOften one-project materialEquipment may be reusedReusable components
CleaningRemove collected sedimentSweep and refresh materialTreat water and remove sedimentMaintain both systems
Material replacementCondition-based inspectionPeriodic aggregate refreshParts and consumablesBoth regimes apply
Removal after projectLift, inspect and storeExcavate and dispose or recoverDecommission civil and plant worksRemove both stages
Temporary entrancesStrong potential fitCommon but material intensiveDepends on mobilisationFor demanding temporary exits
Local requirementsProject review requiredProject review requiredMay be mandatoryProject review required

COMBINED SYSTEM EXAMPLE

Dry pre-cleaning around a wheel wash

The manufacturer documents a landfill application using FODS before and after a wheel wash. This arrangement illustrates how dry and wet stages may complement each other where the project plan allows.

Read manufacturer case study ↗
SiteFODSWheel washFODSRoad